Record Low Change Orders: Switch Expansion

The total amount of Change Orders for this mobile switch center expansion are the lowest of any other project completed in its region.

The existing Switch had limited DC distribution, limited HVAC, no N+1 generator system, no portable tap-boxes, and no N+1 HVAC systems. Additionally: There was no room to expand within the existing facility.

Despite the risks posed by cold and wet winter weather conditions, Vertex helped the top U.S. wireless carrier to correct these deficincies and implement a 25,564 sq. ft. 2-story building expansion to prepare for the future.

Image of construction close-out